This
page was created because the home page is too cluttered and the scope
of the web page has changed a little. I didn't think that the
cat
would want his own presence on the web. The following rough schedule will be followed. The development will be multistage with some concurrent development; with the following stages: Stage 1 - Lighting Simulator (complete) Stage 2 - Lighting Controller (in work) Stage 3 - Power Line Interface (in work) Stage 4 - Integrate stages 1, 2 and 3 Stage 5 - Home Operating System Software Stage 6 - Garage Door remote control Stage 7 - Power Point control Prototype Stage 8 - Integrate power point prototype into house Stage 9 - Integrate stages 1 to 8 into level 1 of house Stage 10 - Operational Test and evaluation Question: When is a software project finished? Answer: Never |
|
Page created on 31 March 2007 and |
|